Surge | 70~410m | 20~610 mm/s | Up to 1G |
Sway | 70~410mm | 20~610 mm/s | Up to 1G |
Heave | 70~350mm | 20~610 mm/s | Up to 1G |
Roll | 5~40deg | 3~45 deg/s | Up to 600 deg/s² |
Pitch | 5~40deg | 3~45 deg/s | Up to 600 deg/s² |
Yaw | 5~40deg | 3~45 deg/s | Up to 600 deg/s² |
Payload | |||
---|---|---|---|
200 kg | H:Under 500mm | Minimum 1.2 kw / 220V 3 phases | |
1.5 Ton | H:Under 1,200mm | Minimum 12 kw / 220V 3 phases | |
3.0 Ton | H:Under 1,800mm | Minimum 30 kw / 220V 3 phases | |
5.0 Ton | H:Under 2,200mm | Minimum 39 kw / 220V 3 phases | |
8.0 Ton | H:Under 2,500mm | Minimum 66 kw / 220V 3 phases | |
10.0 Ton | H:Under 3,000mm | Minimum 90 kw / 220V 3 phases |